Multi-tenant high-rise electrical systems: Design & code considerations
12:00
Edgar Medina, Eaton Power System Experience Center (PSEC) Manager, explains how electrical power in a multi-tenant high-rise is distributed. Starting from the busway and traveling to the receptacle, Edgar also identifies NFPA 70, National Electrical Code (NEC) requirements that are required for multi-tenant high-rises. Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: http://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: http://videos.eaton.com/experience ------------------------------------------------------------------------------------------------------------------------------------------------ YouTube Chapters 00:00 - Introduction 00:58 - Busway 01:49 - Group metering main 03:38 - Surge protection device (SPD) 04:26 - Meter stacks 06:07 - Digital metering 07:28 - Elevator disconnect switch 08:38 - Load center 10:09 - GFCI 10:59 - AFCI Search terms: high-rise electrical system, electrical power system, main busway, national electrical code, NFPA 70, surge protection device, spd, multi-tenant high-rise, busway, group metering main, nec, meter stacks, digital metering, elevator disconnnet switch, afci, gfci, ashrae 90.1, elevator control, load center, series rated, electrical system, power distribution, group metering, energy code, arc-energy reduction, series rated load center, high-rise power system How is electricity distributed throughout a building? What are some NFPA 70, NEC codes required for multi-tenant high-rises? #powersystem #highrise #power
Edgar Medina, Eaton Power System Experience Center (PSEC) Manager, explains how electrical power in a multi-tenant high-rise is distributed. Starting from the busway and traveling to the receptacle, Edgar also identifies NFPA 70, National Electrical Code (NEC) requirements that are required for multi-tenant high-rises. Thank you for watching one of our many educational videos on the topic of power systems. Schedule a visit to one of Eaton's Power Systems Experience Centers in either Pittsburgh or Houston to learn more! To learn more about Eaton products and our Power Systems Experience Centers: http://eaton.com/experience To view more educational videos from Eaton's Power Systems Experience Centers: http://videos.eaton.com/experience ------------------------------------------------------------------------------------------------------------------------------------------------ YouTube Chapters 00:00 - Introduction 00:58 - Busway 01:49 - Group metering main 03:38 - Surge protection device (SPD) 04:26 - Meter stacks 06:07 - Digital metering 07:28 - Elevator disconnect switch 08:38 - Load center 10:09 - GFCI 10:59 - AFCI Search terms: high-rise electrical system, electrical power system, main busway, national electrical code, NFPA 70, surge protection device, spd, multi-tenant high-rise, busway, group metering main, nec, meter stacks, digital metering, elevator disconnnet switch, afci, gfci, ashrae 90.1, elevator control, load center, series rated, electrical system, power distribution, group metering, energy code, arc-energy reduction, series rated load center, high-rise power system How is electricity distributed throughout a building? What are some NFPA 70, NEC codes required for multi-tenant high-rises? #powersystem #highrise #power
Residential Similar Videos
-
Basics of EV charging
9:41
Erik Hurd discusses the fundamentals of EV charging and how they affect charge time
-
ECCN Sherry Holmes Surge
0:34
ECCN Sherry Holmes Surge
-
UL certification process explained | Eaton PSEC
9:56
Eaton is committed to making safe products that provide everyone with the power of electricity. To ensure that safety, Eaton partners to UL Solutions to test, inspect, and certify our solutions.